6.1 Building Occupant Notification

  • 6.1.1  In accordance with OSHA regulations, all mechanical spaces in pre-1980 buildings must be posted with information on the ACM and PACM that is found within the space. The Building Coordinator will be responsible for ensuring postings are maintained in accordance with Standard Operating Procedure HS16_ASB_SOP003 Asbestos Labeling.
  • 6.1.2  The Asbestos Coordinator and asbestos abatement contractor are responsible for ensuring that notice is provided to residential and business occupants. The notice shall be posted to residential or business occupants of the building ten (10) calendar days prior to the commencement of large scale projects and three (3)calendar days prior to commencement of small and minor scale projects.