Skip to main content

12.0 Documentary History

Documentation
Date Change Made By
3/23/2020 4.3.2 -formatting Greg Smith
3/23/2020 4.6 –added -Ensuring contractor provides documentation to support all new buildings and building renovation projects are asbestos-free as specified in section 7 and submit such documents to to the Asbestos Coordinator Greg Smith
3/23/2020 5.1.1 -This obligation is met by utilizing a third party asbestos certified inspection firm and is managed within the Facilities and Campus Services Greg Smith
3/23/2020 5.1.2 –added -... and lack clear manufacturer information must .. Greg Smith
3/23/2020 9.0 -formatting Greg Smith
Chapter