3/23/2020 |
4.3.2 -formatting |
Greg Smith |
3/23/2020 |
4.6 –added -Ensuring contractor provides documentation to support all new buildings and building renovation projects are asbestos-free as specified in section 7 and submit such documents to to the Asbestos Coordinator |
Greg Smith |
3/23/2020 |
5.1.1 -This obligation is met by utilizing a third party asbestos certified inspection firm and is managed within the Facilities and Campus Services |
Greg Smith |
3/23/2020 |
5.1.2 –added -... and lack clear manufacturer information must .. |
Greg Smith |
3/23/2020 |
9.0 -formatting |
Greg Smith |