Resource Library
Fire Safety Plan - Spanish Protected Document
Spanish Fire Safety Plan.
FM Global Hot Work Permit
The Hot Work Permit is required for any temporary operation involving open flames or producing heat and/or sparks.
This includes, but is not limited to: brazing, cutting, grinding, soldering, torch-applied roofing and welding.
HS14F 001 Chemical Inventory Protected Document
Form for chemical inventory.
Incidental Asbestos Disturbance (SOP 002)
This procedure reviews the proper response to the disturbance of Asbestos Containing Material (ACM) or Presumed Asbestos Containing Material (PACM).
Indoor Air Quality Assessments Protected Document
The objectives of this standard procedure include the following: to maintain indoor air quality within acceptable levels according to ASHRAE and OSHA guidelines; and to respond to indoor quality concerns effectively and to make recommendations for improvement.
Indoor Air Quality Assessment Diary Protected Document
Form for indoor quality assessment diary.
Indoor Air Quality Questionnaire
Links to questionnaire in Cority.
Mold Remediation SOP Protected Document
The Cornell University Mold Remediation program is intended to outline the correct procedures and work practices for Cornell University Personnel when mold is discovered and when conducting mold remediation.