Resource Library
Fall Prevention Hazard Assessment Plan Protected Document
Hazard Assessment Plan includes general information, the hierarchy of controls, fall hazard assessment, and work area sketch.
Fall Prevention Rescue Plan Protected Document
Form for Fall Prevention Rescue Plan.
Frequent Inspection Form (HS5F 303) Protected Document
Crane and Hoist Frequent Inspection Form.
Functional Inspection (HS5F 302) Protected Document
Crane Inspection Functional Tag.
FM Global Hot Work Permit
The Hot Work Permit is required for any temporary operation involving open flames or producing heat and/or sparks.
This includes, but is not limited to: brazing, cutting, grinding, soldering, torch-applied roofing and welding.
HS21 F 001 Window Washing Plan Template Protected Document
Form for Window Washing Plan.
HS2F 001 Multiple Energy Isolation Checklist (MEIC)
When systems or equipment require the shutdown of multiple energy isolating devices or have multiple hazardous energy sources, a written Multiple Energy Isolation Checklist shall be established.