Resource Library
Mobile Crane Planning and Safety Requirements
This procedure outlines: the purpose and requirements, scope, responsibilities, procedure instructions, and checklist.
Mold Remediation SOP Protected Document
The Cornell University Mold Remediation program is intended to outline the correct procedures and work practices for Cornell University Personnel when mold is discovered and when conducting mold remediation.
Personal Protective Equipment on Construction Sites
The procedure establishes the minimum personal protective equipment (PPE) to be worn by
University employees and their visitors while on a construction site.
Post-Fire Building Re-Occupancy Procedure Protected Document
Interior fires can result in the release of vapors, gases, and particulates that can cause both acute and chronic health issues. Even after the fire is extinguished there is the potential for harmful airborne contaminants to be present in the area. The purpose of monitoring the air quality post-fire is to ensure the contaminate levels are below established limits prior to the space being reoccupied.
Potential Asbestos Containing Material Building Products (SP 001)
Shows a listing of building materials that potentially contain asbestos.
Prohibited Isolated Work Procedure Protected Document
This procedure gives an introduction, scope, procedures, definitions and document history.
Requirements for Sign Classification, Design, and Placement Protected Document
This Standard Operating Procedure (SOP) has been developed to establish baseline requirements for the classification, design, and placement of safety-related signage. This SOP also provides instruction on color coding of physical items and emergency equipment.
Spill Cleanup Procedure
Procedure for spill cleanup.