Resource Library
Asbestos Material Labeling (SP 003)
Reviews Background, Scope, Responsibilities, Procedure, Reference and Labels.
Facility Flood Response
The purpose of this procedure is to define responsibilities and a procedure for facility flood response, remediation, and insurance claim.
Incidental Asbestos Disturbance (SOP 002)
This procedure reviews the proper response to the disturbance of Asbestos Containing Material (ACM) or Presumed Asbestos Containing Material (PACM).
Indoor Air Quality Assessments Protected Document
The objectives of this standard procedure include the following: to maintain indoor air quality within acceptable levels according to ASHRAE and OSHA guidelines; and to respond to indoor quality concerns effectively and to make recommendations for improvement.
Less Than 1 Percent Asbestos (SOP 004)
Less Than 1 Percent Asbestos (SOP 004)
Mobile Crane Planning and Safety Requirements
This procedure outlines: the purpose and requirements, scope, responsibilities, procedure instructions, and checklist.
Mold Remediation SOP Protected Document
The Cornell University Mold Remediation program is intended to outline the correct procedures and work practices for Cornell University Personnel when mold is discovered and when conducting mold remediation.
Personal Protective Equipment on Construction Sites
The procedure establishes the minimum personal protective equipment (PPE) to be worn by
University employees and their visitors while on a construction site.