Asbestos Material Labeling (SP 003)

Reviews Background, Scope, Responsibilities, Procedure, Reference and Labels.

Categories:

Procedures

Facility Flood Response

The purpose of this procedure is to define responsibilities and a procedure for facility flood response, remediation, and insurance claim.

Categories:

Procedures

Incidental Asbestos Disturbance (SOP 002)

This procedure reviews the proper response to the disturbance of Asbestos Containing Material (ACM) or Presumed Asbestos Containing Material (PACM).

Categories:

Procedures

Indoor Air Quality Assessments Protected Document

The objectives of this standard procedure include the following: to maintain indoor air quality within acceptable levels according to ASHRAE and OSHA guidelines; and to respond to indoor quality concerns effectively and to make recommendations for improvement.

Categories:

Procedures

Mobile Crane Planning and Safety Requirements

This procedure outlines: the purpose and requirements, scope, responsibilities, procedure instructions, and checklist.

Categories:

Procedures

Mold Remediation SOP Protected Document

The Cornell University Mold Remediation program is intended to outline the correct procedures and work practices for Cornell University Personnel when mold is discovered and when conducting mold remediation.

Categories:

Procedures

Personal Protective Equipment on Construction Sites

The procedure establishes the minimum personal protective equipment (PPE) to be worn by
University employees and their visitors while on a construction site.

Categories:

Procedures

Post-Fire Building Re-Occupancy Procedure Protected Document

Interior fires can result in the release of vapors, gases, and particulates that can cause both acute and chronic health issues. Even after the fire is extinguished there is the potential for harmful airborne contaminants to be present in the area. The purpose of monitoring the air quality post-fire is to ensure the contaminate levels are below established limits prior to the space being reoccupied.