Skip to main content

Resource Library

Personal Protective Equipment on Construction Sites

The procedure establishes the minimum personal protective equipment (PPE) to be worn by
University employees and their visitors while on a construction site.

Categories:

Procedures

Post-Fire Building Re-Occupancy Procedure Protected Document

Interior fires can result in the release of vapors, gases, and particulates that can cause both acute and chronic health issues. Even after the fire is extinguished there is the potential for harmful airborne contaminants to be present in the area. The purpose of monitoring the air quality post-fire is to ensure the contaminate levels are below established limits prior to the space being reoccupied.

Prohibited Isolated Work Procedure Protected Document

This procedure gives an introduction, scope, procedures, definitions and document history.

Categories:

Procedures

Spill Cleanup Procedure

Procedure for spill cleanup.

Categories:

Procedures

Vacating a Structure or Premises

This Standard Operating Procedure (SOP) will identify the process for safeguarding all vacant buildings and structures through the submission of a Structure/Vacant Premises Application Form and Facility Closure Plan. This SOP will also assign specific responsibilities for property owners, Authority Having Jurisdiction (AHJ), and University Fire Marshal’s Office (UFM).

Categories:

Procedures