Skip to main content

Resource Library

Post-Fire Building Re-Occupancy Procedure Protected Document

Interior fires can result in the release of vapors, gases, and particulates that can cause both acute and chronic health issues. Even after the fire is extinguished there is the potential for harmful airborne contaminants to be present in the area. The purpose of monitoring the air quality post-fire is to ensure the contaminate levels are below established limits prior to the space being reoccupied.

Potential Asbestos Containing Material Building Products (SP 001)

Shows a listing of building materials that potentially contain asbestos.

Categories:

Procedures

3D Printer and Media Review

This is a review of 3D printer media types and printers.

Categories:

Guidelines

Project Manager Procedures for Hazardous Materials

Procedures for project manager for hazardous materials.

Categories:

Toolbox Talk

Recommended Ear Muffs Protected Document

Ear Muff recommendations.

Categories:

Guidelines

Recommended Ear Plugs

Describes five different ear plugs.

Categories:

Guidelines

Requirements for Sign Classification, Design, and Placement Protected Document

This Standard Operating Procedure (SOP) has been developed to establish baseline requirements for the classification, design, and placement of safety-related signage. This SOP also provides instruction on color coding of physical items and emergency equipment.

Categories:

Procedures