Skip to main content

Resource Library

Mobile Crane Planning and Safety Requirements

This procedure outlines: the purpose and requirements, scope, responsibilities, procedure instructions, and checklist.

Categories:

Procedures

Personal Protective Equipment on Construction Sites

The procedure establishes the minimum personal protective equipment (PPE) to be worn by
University employees and their visitors while on a construction site.

Categories:

Procedures

Post-Fire Building Re-Occupancy Procedure Protected Document

Interior fires can result in the release of vapors, gases, and particulates that can cause both acute and chronic health issues. Even after the fire is extinguished there is the potential for harmful airborne contaminants to be present in the area. The purpose of monitoring the air quality post-fire is to ensure the contaminate levels are below established limits prior to the space being reoccupied.

Prohibited Isolated Work Procedure Protected Document

This procedure gives an introduction, scope, procedures, definitions and document history.

Categories:

Procedures

Repair Shop Safety Training Matrix

Reviews: minimum required PPE, hazards and controls, limitations, and machine guarding.

Categories:

Training

Spill Cleanup Procedure

Procedure for spill cleanup.

Categories:

Procedures