Resource Library
Industrial Scientific MX4 Bump Test, Calibration Forced Bump Test, and Forced Calibration Procedures Protected Document
Instructions for bump testing, calibrating, and forced procedures for the Industrial Scientific MX4 air meters on docking stations. Instructions for calibration failure —“Forced Calibration”. Instructions for bump test failure —“Forced Bump Test”.
iNet Control Training Videos
These training videos provide an overview of the INet Control system which is used to monitor and maintain the 4 gas meters and docking stations used on campus.
Infectious Disease Preparedness for Event Planners
Information on infectious disease preparedness, including coronavirus.
Initial Inspection Form (HS5F 301) Protected Document
Crane and Hoist Safety Initial Inspection Form.
Injection Wells: USEPA 40 CFR Part 144 - Underground Injection Control Program
Links to ECFR website.
Injection Wells: USEPA Underground Injection Control
Links to EPA website.
Jigsaw Safety Toolbox Talk
Reviews preparation of safe operations and procedures of using a jigsaw.