2.1.4 Removal of Existing Fume Hoods

Any removal of fume hoods and capture devices requires prior consultation with your Building Coordinator, Facilities Services, and EHS. This is necessary to ensure building ventilation systems are not affected by removal of fume hoods and capture devices, and so utility services such as electrical lines, plumbing systems, and water and gas supply lines are properly disconnected. For more information about decommissioning of fume hoods, go to the Laboratory Ventilation page.

There is an additional concern for the presence of asbestos within the fume hood itself, and potentially in any pipe insulation associated with the ductwork and/or Mercury in cup sinks. Any asbestos must be properly removed and disposed of by a certified asbestos removal company. EHS can assist laboratories with the cleanup of any Mercury contamination. Contact EHS at 607-255-8200 for more information or questions about potential asbestos or Mercury contamination.  See the Lab Move Guide in the appendix for more information. 